Angle-distance method to stake out the horizontal alignment by total RTK basically focuses on utilizing actual information at the time of survey based on GPS information, rather . Consequently, Union Station is Via Rail's busiest and most visited station by far. It will be located near the future Thorncliffe Park station. Under Manufacturer , select Sokkia or whichever is the correct manufacturer for your Total Station. Sokkia SET 550 Total StationSokkia SET 550 Total Station Keys/ScreenKeys/Screen 5. Pocket 3D: Creating Polyline from points. [60][61] The faade of the bank building will be dismantled and preserved for use on the new station entrance building. Switch to General Survey to take a topo shot on a known benchmark or turning point as a The LN-100 enabled us to stake-out the large number of points while still maintaining high accuracies. The line proceeded northeast to Pape Avenue and Danforth Avenue and continued north along Pape Avenue, making a northsouth crossing of the Don River to the Thorncliffe Park neighbourhood. However, regardless of how technologically advanced the Total Station is built, it takes a competent surveyor to ensure an accurate and precise instrument station set-up. Total station field techniques. Thank you for purchasing this Leica Total Station. . A shoe to the pole point could is required in soft ground. [56], The station structure will be separate from the parallel railway bridge and embankment. With point B sighted, set the horizontal circle to zero, turn the total station by 90 and set out the second line AC with the points A4, A5, and A6. INTRODUCTION This report discusses the use of the Sokkisha SET2 electronic total station for topographic surveying. Then select the Model of your Total Station from the dropdown menu. Metrolinx plans to rebuild the bridge over Queen Street in order to have it rise 5 metres (16ft) over street level instead of the current 3.9 metres (13ft). From the plan (fig 1), the centre line of the walls are calculated. Running slightly east of Pape Avenue, the Ontario Line will have a centre platform under Line 2 at the station. Distance, gradient, difference in height between two inaccessible points using total station 14. Record the horizontal and vertical angles using the viewing scope found on the theodolites side. Providing reliable, accurate and innovative mining and survey equipment Press F4 OK. 8. Immediately south of this station, the line would turn west along the Hydro One right-of-way, and cross the Don Valley on a new bridge. Decades of experience automating mine surveying plus proven results make NSS the ideal partner for Hexagon in our efforts to serve Underground customers in the US and Canada. Under Manufacturer , select Sokkia or whichever is the correct manufacturer for your Total Station. It will be located under the west side of Pape Avenue so as to avoid digging up Pape Avenue itself during construction. SET1X SET2X SET3X SET5X Total Station SETX. A Total Station has electronic documentation and sketching functions, which reduces the need for paper field notes. See More. SITENG - Setting Out #7 "Stakeout" In today's video I am showing how to use the Stakeout program using a Total Station. Because of their capacity to improve the surveying operation significantly, they can be classified into a separate group. More accurate versions are offered for construction design applicatione.g., 1-minute instruments. You should be prompted for your stakeout job when opening the App. It is possible to set out curves using tapes only but this can be The Ontario Line station will have centre platforms and two entrances. One and three array prism ranges may vary from one mile to over 5 miles. Coordinate calculation. [45], South from Pape station, the line would travel roughly under Pape Avenue, emerging to the surface just north of Gerrard Street. When classical terrestrial surveying methods are used in staking out of highway construction projects one can meet with some difficulties such . By December 2020, the completion date had been revised to 2030. Set up is similar in many ways to the set up technique explained earlier when surveying with the total station setup over a known station. After the position of the total station was identified, the 12 points of the specified building positions assigned were added in the data collector and then staked out. This manual contains important safety directions (refer to section Safety directions) as well as instructions This 3-day course comprises days 3-5 of the 5-day course, Setting Out For Construction. Tip. [67] A consultant's report, dated February 1, 2023, and commissioned by the City of Toronto, concluded that the corner of the Osgoode Hall grounds was the best site for a headhouse based on various criteria but that the Campbell House grounds was a potentially feasible alternative site. This resulted in accomplishing the stake-out of all 20,000 points in 4 days." In the next screen, use the keypad to enter the coordinates or distances and press the "OK" button to measure. Step 5. Purchase Congratulations on the purchase of a Leica TS11/TS15. [27] The City of Toronto's Relief Line proposal was expected to use existing heavy-rail rolling stock that is also used on Lines 1, 2, and 4. This infor-mation and the GNSS data are either post-processed at the survey office or calculated in real-time on site. Additional things to be considered in the range of a particular total station include robotic search controllers, measurement time, integrated laser scanners, integrated GPS, internal digital camera, internal data storage capability, inner COGO and stakeout capacities. Category: The line would pass through Thorncliffe Park station, which would be over the western portion of Thorncliffe Park Boulevard. Angle-distance method to stake out the horizontal alignment by total station , Assuming that the total station with reflector is the tool that it is intended to lay out the circular curve after being designed then the only way to do so is to construct a table that contains angle-distance values. This movement from the construction plan to the actual site by transferring dimensions from the layout plan to the ground is called setting out. To fully understand the use of surveying instruments, take a course from a licensed surveyor. Extract and relate coordinate information from drawings. Utilizing the telescope tangent screw and the tangent screw, center the eyepiece lens vertically and horizontally on the prism with the cross hairs centered on the prism. joe and the juice tunacado ingredients; pickleball courts brentwood; tornado damage in princeton, ky; marshall county inmate roster; stake out using total station. The new route would substitute a Corktown station about 500 metres (1,600ft) west of the proposed location for Sumach station on the Relief Line. We couldnt be happier! But Ford himself is cause for skepticism", "Ontario unveils $28.5-billion transit plan, vows to double length of Toronto's downtown relief line", "Ford transit plan like 'Groundhog Day' for waterfront: Coun. Discussions with users at other engineers and surveyors, local survey suppliers, and AE survey builders are will also be recommended. 1. Connections to the 504 King and 511 Bathurst streetcars will be available on the surface. You can participate in any of the Civil Simplified workshops including SConstruction Project Management, Building Information Modeling (BIM), Bridge Design, Fabrication & Testing, Tall Buildings Design, Seismic Design of Buildings, Foundation Engineering and Analysis, Survey Camp using Total Station, Applications of GIS, Transportation Engineering, .Civil Simplified offers the best quality training programs in India designed by IIT graduates. Digital panel: Displays the values of distance, angle, height and the co-ordinates of the observed point, where the reflector (target) is kept. Obtain the architect or building plan. Operating costs for the above-ground sections may be higher due to exposure to the elements. This manual contains important safety directions as well as instructions for setting up the product and operating it. https://youtube.com/watch?v=2GCCaKlxmAU, Controlling Vertical Towers w3.leica-geosystems.com. SITENG - Setting Out #7 \"Stakeout\" In today's video I am showing how to use the Stakeout program using a Total Station. All the equipment used The name for an instrument of this type was electronic tacheometer, but Hewlett-Packard introduced the name total station more than 30 years ago, along with the name immediately caught on with the profession (As per below figure No 2 & 3). A good place to being is viewing periodic surveys by trade publications. With the aid of trigonometry, the distances and angles may be utilized to calculate the real positions (x, y, and z or northing,) of surveyed points in total terms. It combines the functions of a theodolite with that of a transit level and electronic distance meter (EDM). Setting-Out Points Using the Total Station Interface in As-Built for Here is how to use a total station for this type of action: Position the device at a known point by setting the horizontal circle. Some total stations, such as the Leica FlexLine series, have a Reference Line application. Then proceed to create a polyline from the alignment by simply offsetting it over 1m and back 1m. The line would continue westward to a QueenSpadina station, then diagonally southwest via a KingBathurst station to Strachan Avenue. Step 3. Traversing using Total Station 10. Exactly how you setup and configure the system depends on the task. (Overlea Boulevard and Thorncliffe Park Drive intersect at two places within Thorncliffe Park. Setting-Out Points Using the Total Station Interface in As-Built for AutoCAD Setting-Out Points Using the Total Station Interface in As-Built for AutoCAD Last updated Save as PDF Share Setting-out with As-Built Setting-out Points if Control Points are Available Setting-out Points if Control Points are Not Available Setting-out Axes (Batter Board) What is Setting Out/Stake out? Introduction. A Metrolinx goal is to reduce congestion at Union Station by 14 percent by encouraging passengers to use the Ontario Line. Selection of a particular model, together with the associated data collector and. There will be a shared concourse between the Ontario Line and GO Transit train services. Parts of the SET Total StationParts of the SET Total Station 4. TPS02 06 - Survey machine manual - Starting the Survey Using TS 06 Plus Select . Focus and plate management tangent and locking screws vary widely between total station brands. Various techniques and instruments are used for this process of setting out. Tail tracks will extend west of the platforms to Dufferin Street for storing and turning back trains and a possible future extension. F4 . Jobs & Data. This manual contains important safety directions as well as instructions for setting up the product and operating it. The contracts are:[31], On June 2, 2020, Infrastructure Ontario (IO) and Metrolinx issued a request for qualification (RFQ) for rolling stock, systems, operations and maintenance (RSSOM), marking the first phase of procurement for the Ontario Line. Mapping and stake out. Trimble Trimble S Series Total Station User Guide v Important Information 1 Laser Safety Before using the instrument, make sure that you understand this user guide, as well as all Establishing the four corners in relation to the dimension of the building floor . stake out using total stationmeat carving knife blank. Follow the LinkedIn page LinkedIn: https://www.linkedin.com/company/sitenghttps://www.linkedin.com/in/greg-stepien-7346ab183Subscribe: https://www.youtube.com/c/SITENG?sub_confirmation=1 EVERY GOOD CIVIL SITE ENGINEER MUST HAVE - watch the VID https://youtu.be/4X-nwn-J-wo - items I use and recommend SAFETY BOOTS-choose your size https://amzn.to/3NfjUCJ https://www.screwfix.com/p/dewalt-phoenix-safety-boots-tan-size-9/7001vTAPE MEASURE https://amzn.to/3xQ3cEf https://amzn.to/3xZ9ykMTAPE HOLDER https://amzn.to/3NzLDOV https://ffx.co.uk/product/Get/Makita-E-05278-088381566780-Tape-Measure-Holder CALCULATOR - sometimes you can find them half price in Supermarkets https://amzn.to/3u2hHE6DRAWING FOLDER https://amzn.to/3NqYoeA https://amzn.to/39OUNZP NOTEBOOK - get whatever really to take some notes https://amzn.to/3HQkbLxPENCIL - 0.7mm - good price, but for this colour https://amzn.to/3OlvwW3PENCIL - 2mm https://amzn.to/3QHVIffJOINER'S PENCIL https://amzn.to/3xRIaFlTIPP-EX - these are the best I used https://amzn.to/3QNrKGHPERMANENT MARKERS https://amzn.to/3ykpcZvCHALK LINE https://amzn.to/3A0aUOYFEW EXTRAS I USE TOO SMALL SPIRIT LEVEL - you can always borrow from a Chippie if needed https://amzn.to/3OEXs79KNIFE https://amzn.to/3HQKUrl GLASSES - Despite you will get safety glasses, on some sites theyre really low quality and I dont want to get my sight worse using them. A set of plugs can be used to locate the total station set up in a drift or tunnel by processing measurements to the plugs by intersection and resection. Station names and other details are subject to change. [11], Since the early 21st century, studies proposed a line that would run south from Line 2 BloorDanforth at a point east of the Don River before bending westward along Queen Street into Downtown Toronto. stake out using total station. Trusted measurement instruments and engaging software for diverse applications and industries including engineering, construction and mining. They are listed as follows: Manual Method - Manual slope staking using a rag tape, fiberglass rod and level. [72][73] A new station entrance will be built at 1 Atlantic Avenue.[38]. Then the centre lines of the rooms are set out by setting perpendiculars in the ratio 3:4:5. Using the collimator (a crude sighting device) on the top of the total station instrument, align the total station with the prism. Read carefully through the User Manual before you switch on the product. For most programs, a retro-reflector prism is attached to the top of the.